Designing an expanded trail system for Wrangell is no walk in the park
A project that has been in the works for about a decade – the first step in an interconnected Wrangell trail system – is nearly ready to be built. But engineering a new trail down a small mountain, across woodlands and wet muskeg is a big job.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed